+86 137 7627 8625

WhatsApp/Mobile

1@festamachine.com

Quickly reply within 5hours

Water filling production line bottle buffering conveyor system

Technical Parameter

1. Side panel: 304 stainless steel wire drawing plate, thickness 2.5mm.

2. Power: SEW.

3. Support legs: 304 stainless steel stamping structure.

4. Cover: 304 stainless steel, thickness = 1mm.

5. Lubricating fluid section sink: 304 stainless steel, thickness ≥ 1mm.

6. Chain plate: domestic high-quality plastic chain plate, polyoxymethylene (POM).

7. Bearing housing: 304 stainless steel housing.

8. PLC: Select Schneider, Panasonic, etc.

9. Inverter: Inverter such as Schneider

Details About Water filling production line bottle buffering conveyor system

Product Description:

The conveyor line is a bridge connecting the production equipment, which directly affects the operation efficiency of the production line. In the configuration of the conveyor line, it must be considered that the short-term shutdown of the rear-end equipment (for example, replacement of the label, etc.) does not affect the operation of the front-end equipment, and the equipment in the front and rear sections should be well connected to make the whole The production line achieves high operating efficiency. Our company’s conveyor line is a new bottle conveying system. It can be used for the transportation of round bottles of beer and beverage. The mechanical structure of the system is completely new. Most of the components are stamped or bent and have good rigidity. Light weight and good interchangeability. The operation is reliable and the maintenance is convenient. The electric control system adopts PLC to control the operation of the whole solid bottle conveying and buffering system, and automatically realizes the functions of running speed acceleration and deceleration and automatic buffering.

Leave your questions, we will reply to you within 11hrs





    Our Professional Workers

    PET bottle filling machine manufacturers

    Machining Equipment

    machining capacity for water bottling machine

    Successful Bottling Line Projects

    the complete bottling line manufacturer

    We only work with Top supplier

    top parts for filling machine

    Packaging and Delivery

    filling machine packaging machine

    Transfer your idea to final product

    Festa Machine_Hot_Fill_Complete_Line_Solutions_Complete_Line_

    FAQ about Festa

    We are an Original Equipment Manufacturer, so that we can provide you high quality machines in reasonable price. If you have plan to visit China, please visit our factory to check it.

    Design and production time is around 45 to 60 days, the exactly time depend on what kind of machine you order. The shipping time is based on your destination port.

    We will arrange our experienced engineers to your factory for installation and commissioning, and train your staff how to operate the whole production line.

    According your project, we will send one or two engineers to your plant, it will take about 15 days to 35 days.

    We can design the machines according your requirements (material, power, filling type, bottle type, automation level). We will also give you professional suggestions according to our experience.

    We offer you high quality machines with 12 months warranty and supply life-long technical support.

    Get Quote Today!